A case study on the equipment, infrastructure, and workflows that were leveraged by SVT Sweden to support FIS Alpine Ski World Cup. With the remote site in Åre, Sweden separated by over 600 km from the production studios in Stockholm, new and unique technologies were required to make this remote production a success.
File Type:
pdf
Categories:
Case Study
Presenters:
robert erickson - Grass Valley
Year:
2019
Downloads:
2